NORTH COAST, Calif. – Caltrans reports that the following road projects will be taking place around the North Coast during the coming week.
Included are Mendocino County projects that may impact Lake County commuters.
LAKE COUNTY
Highway 20
– Pavement repairs from Rosemont Drive to the junction of Routes 20/53 will continue. One-way traffic control will be in effect from 6 p.m. to 7 a.m., or from 7 a.m. to 3 p.m., weekdays. Motorists should anticipate 15-minute delays.
Highway 29
– Valley Fire cleanup from the Lake/Napa County line to Hidden Valley will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. seven days per week. Motorists should anticipate 15-minute delays.
– Pavement repairs from Main Street in Kelseyville to the junction of Routes 29/175 near Lakeport will continue. One-way traffic control will be in effect from 6 p.m. to 6 a.m., weekdays. Motorists should anticipate 15-minute delays.
Highway 175
– Fire recovery work from the junction of Routes 29/175 in Middletown to Loch Lomond will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m., 7 days per week. Motorists should anticipate 15-minute delays.
MENDOCINO COUNTY
Highway 1
– PG&E has been granted a Caltrans encroachment permit for tree trimming from Fish Rock Road to south Iverson Road beginning Monday, Nov. 2. One-way traffic control will be in effect from 5 a.m. to 5 p.m., weekdays. Motorists should anticipate five-minute delays.
– Bridge painting at the Navarro River Bridge will begin Tuesday, Nov. 3. One-way traffic control will be in effect from 7 a.m. to 3 p.m., weekdays. Motorists should anticipate five-minute delays.
– Highway repairs just north of Ocean Meadows Circle will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate five-minute delays.
Highway 20
– Pavement repairs from Old Willits Road to just east of Road 350 will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m., weekdays. Motorists should anticipate 15-minute delays.
Highway 101
– Caltrans will perform slide repairs near the Korean War Veterans Memorial Bridge (near Frog Woman Rock). Northbound traffic will be restricted to one lane 24 hours per day, seven days per week. Motorists may experience minor traffic slowdowns.
– Pavement repairs from 0.3 miles north of Nelson Road to the Route 101/253 interchange will continue. Work hours are 6 a.m. to 6 p.m., weekdays. In two-lane sections, one-way traffic control will be in effect, and motorists should anticipate 15-minute delays. In four-lane sections, traffic will be restricted to one lane in each direction, and motorists should anticipate minor traffic slowdowns. At the Robinson Overcrossing and El Roble Overcrossing interchanges, ramps will be intermittently closed, and motorists should seek an alternate route. No consecutive offramps or onramps will be closed at the same time.
– Highway construction from Sherwood Road to the north Willits railroad crossing will continue through Saturday, Oct. 31. Intermittent one-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should anticipate five-minute delays.
– Bridge rehabilitation at the Arnold Bridge Overcrossing will continue. Traffic will be restricted to one lane in each direction from 6 a.m. to 6 p.m., weekdays. Motorists should anticipate minor traffic slowdowns.
– Pavement repairs from Harwood Road to Rattlesnake Creek will continue. One-way traffic control will be in effect from 7 a.m. to 6:30 p.m., Monday through Saturday. Motorists should anticipate 15-minute delays.
– Bridge rehabilitation at the Jitney Gulch Bridge, Rock Creek Bridge, and the Bridges Creek Bridge will continue. One-way traffic control will be in effect from 6 a.m. to 5 p.m., weekdays. Motorists should anticipate five-minute delays.
– Bridge rehabilitation at various South Fork Eel River Bridges from Piercy to the Humboldt/Mendocino County line will continue. Traffic will be restricted to one lane in each direction from 6 a.m. to 6 p.m., weekdays. Motorists should anticipate minor traffic slowdowns.
Highway 128
– Toulouse Vineyards of Philo has been granted a Caltrans encroachment permit to pave a commercial driveway 0.4 mile west of Philo beginning Monday, Nov. 2. One-way traffic control will be in effect from 8 a.m. to 5 p.m., weekdays. Motorists should anticipate five-minute delays.
The Caltrans Traffic Operations Office has reviewed each project and determined that individual project delays are expected to be less than the statewide policy maximum of 30 minutes, unless noted otherwise above.
For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).